Brands     Vishay Measurements Group     Interactive Guide     Gage Installation Techniques     VS-116

Gage Bonding
 
Gage Preparation

Start by washing your hands with soap and water.

Also clean the work surface, shears , and tweezers with M-Prep Neutralizer 5A .


Carefully remove the folder containing the gage from the plastic pouch. Hold the folder open in butterfly fashion.



Page 3 of 11