Brands
Vishay Measurements Group
Interactive Guide
Gage Installation Techniques
VS-121
Gage Installation Techniques
Leadwire Attachment
The subject of this sequence is general-purpose leadwire attachment for static and dynamic measurements with Micro-Measurements
EA-Series
gages.
A quarter-bridge installation will be demonstrated using the three-wire method of leadwire temperature compensation.
Six basic operations are required:
Leadwire Stripping
Leadwire Preparation and Tinning
Gage and Terminal Tinning
Leadwire Attachment
Rosin Removal
Leadwire Anchoring
The use of safety glasses is recommended during soldering operations.
Page 1 of 13
Copyright © 1998. Vishay Measurements Group, Inc. All right reserved.