Gage Installation Techniques
VS-122
Gage Installation Techniques
Leadwire Attachment
This sequence covers leadwire attachment on Micro-Measurements
CEA-Series
gages, for static strain measurement.
In this sequence we will make a quarter-bridge installation. It will incorporate the three-wire method of leadwire temperature compensation.
Six basic operations are required:
Leadwire Stripping
Leadwire Preparation and Tinning
Gage Tinning
Leadwire Attachment
Rosin Removal
Leadwire Anchoring
The use of safety glasses is recommended during soldering operations.