Brands     Vishay Measurements Group     Interactive Guide     Gage Installation Techniques     VS-123

  Gage Installation Techniques

 
Leadwire Attachment
 
This sequence covers leadwire attachment for static strain measurements above 300 deg F with Micro-Measurements WA- and WK-Series gages.

A quarter-bridge installation, using the three-wire method of leadwire temperature compensation, will be demonstrated.


 
Seven basic operations are required:
 
  Preparation
  Terminal Tinning
  Ribbon Attachment
  Leadwire Tinning
  Leadwire Attachment
  Rosin Removal
  Leadwire Anchoring
 

The use of safety glasses is recommended during soldering operations.
 
 


Page 1 of 12

Copyright © 1998. Vishay Measurements Group, Inc. All right reserved.