|
Gage Installation Techniques
|
|
|
Leadwire Attachment
|
This sequence covers leadwire attachment for static
strain measurements above 300 deg F with
Micro-Measurements
WA-
and
WK-Series
gages.
A quarter-bridge installation, using the three-wire
method of leadwire temperature compensation, will be
demonstrated.
Seven basic operations are required:
Preparation
Terminal Tinning
Ribbon Attachment
Leadwire Tinning
Leadwire Attachment
Rosin Removal
Leadwire Anchoring
The use of safety glasses is recommended during
soldering operations.
|
|
|
Page 1 of 12
Copyright © 1998. Vishay
Measurements Group, Inc. All right reserved.
|
|