Brands     Vishay Measurements Group     Interactive Guide     Tech Tips     TT-604


Leadwire Attachment Techniques for Obtaining
Maximum Fatigue Life of Strain Gages

Lead Preparation and Attachment

Step 1

Carefully lift the gage lead ribbons from the specimen surface by laying the wood extension of a cotton-tipped applicator firmly across the gage at the lead exit point, grasping each lead end with tweezers and raising the lead at a shallow angle (shown below). Avoid introducing kinks or sharp corners.




Page 3 of 10